Training Long Lead
by Dexil

Product Details
- Brand
- Dexil
- Condition
- new
- Model
- 0165005
- MPN
- 0165005
- Category
- Pets & Pet Care
Training Long Lead is available for £10.99 at Pharmacy2U Shop.
Available at Pharmacy2U Shop
Compare Prices(1 shop)
Description
This product is created for animals and is not intended for human use What is Dexil Training Long Lead? Dexil Training Lead The Dexil Training Lead offers a safe and comfortable way to give your dog room to explore while clearly communicating their training or behavioural needs. Whether your dog needs extra space, is in training, or requires special consideration, this lead’s colour-coded, embroidered design ensures others know exactly how to approach or interact with your pet. Crafted from high-strength polypropylene nylon webbing and finished with welded ‘O’ and ‘D’ rings, this durable lead handles daily walks and outdoor adventures with ease. The luxury padded handle provides comfort for you, while the generous 180cm length gives dogs the space they need for effective training and socialisation. Easy to clean in the washing machine at 30°C, the Dexil Training Lead is best paired with a strap harness for optimal control and security during walks. Key features: Up to 180cm (72”) in length and 25mm (1”) wide for lasting strength and reliability Padded, luxury handle for comfortable grip on every walk Embroidered with 4 clear words on each side (8 total) to communicate your dog’s training or behavioural requirements Made from tough polypropylene nylon webbing with welded rings for durability Machine washable at 30°C for easy cleaning and hygiene Recommended for use with strap harnesses for the best control and safety
Shop Reviews
No reviews yet. Bought this product? Share your experience with one of the shops below.
Frequently Asked Questions
- What is the cheapest price for Training Long Lead?
- Training Long Lead by Dexil is available for £10.99 at Pharmacy2U Shop. Price checked and updated daily.
More from Dexil
Similar products at The Virtual Mall
Waterproof All Weather Stormguard Dog Coat
Ancol
Timberwolf Leather Collar Lightweight Comfort
Ancol
Viva Weather Proof Lightweight Comfy Buckle Dog Collar
Ancol
Softweave Dog Collar Made
Ancol
Viva Reversible Adjustable Dog Puffer Coat
Ancol
Timberwolf Comfortable Round Dog Collar
Ancol





