Skip to main content

No Dogs Long Lead

by Dexil

No Dogs Long Lead

Product Details

Brand
Dexil
Condition
new
Model
0165001
MPN
0165001

No Dogs Long Lead is available for £10.99 at Pharmacy2U Shop.

£10.99

Available at Pharmacy2U Shop

Compare Prices(1 shop)

Extra 5% off with code 5OFF
£10.44
Best with voucher
View voucher

Description

This product is created for animals and is not intended for human use What is Dexil No Dogs Long Lead? The Dexil No Dogs Lead is designed to give your dog freedom to roam while clearly signalling to others that your dog prefers space. Perfect for dogs that are not comfortable with other dogs, children, or adults, this lead uses a colour-coded system and embroidered wording to prevent misunderstandings and keep walks calm and safe. Crafted from high-strength polypropylene nylon webbing with welded ‘O’ and ‘D’ rings, this lead is durable, reliable, and built to last. The luxury padded handle ensures comfort for the handler, while up to 180cm of length provides ample control. Machine washable at 30°C, it is easy to keep clean and maintain. Key features: Lead with luxury padded handle for comfort Colour-coded and embroidered with “No Dogs” message (4 words per side, 8 total) for clear communication High-strength polypropylene nylon webbing with welded rings for durability Machine washable at 30°C for easy cleaning 25mm width (1”) – best used with strap harnesses

Shop Reviews

No reviews yet. Bought this product? Share your experience with one of the shops below.

Frequently Asked Questions

What is the cheapest price for No Dogs Long Lead?
No Dogs Long Lead by Dexil is available for £10.99 at Pharmacy2U Shop. Price checked and updated daily.